There are plenty of foundation pillars waiting to be filled
Resource ID: 2885Similar Items
The door of the mud house is open, Old culture
by Waheed Ahmed
A mud room with an iron door, old architecture stock footage
by Waheed Ahmed
A view of excavating the foundation for Bike Showroom
by Waheed Ahmed
A view of the excavation by crane for the foundation along the National Highway
by Waheed Ahmed
Excavation and brick scene for shop construction.
by Waheed Ahmed
IMG 202A close-up view of the red bricks of the fallen wall in the sugarcane field30911 084009
by Waheed Ahmed
A view of iron pillars and measurement at intervals in the red brick wall
by Waheed Ahmed
An iron net and pillars were prepared for the foundation.
by Waheed Ahmed
One side wall is complete and on the other side iron pillar and mesh is laid to complete the foundation
by Waheed Ahmed
A triangular-style pillar with netting and filling remaining
by Waheed Ahmed